Please browse the previous projects we have undertaken in the Greater Belfast area to see how we have completely transformed run down properties into bright, modern homes appreciated by todays discerning buyers. We took on a major refurbishment of this detached 4 bedroom bungalow that had not been touched since 1966.
We donated the original kitchen to an retro enthusiast and thoroughly modernised the property. Refurbished and extended semi-detached property in quiet street off Malone Road. The property was in a very poor state of repair when purchased. We extended the kitchen and altered the internal walls to incorporate a utility room and downstairs toilet.
A new bathroom was installed and house was re-plastered from top to bottom. New doors and architrave was fitted throughout. A contemporary kitchen with marble worktops and splash backs was installed. This excellent attractive semi detached property occupies a superb extensive level site within a much sought after residential area and is extremely convenient to the many amenities in the surrounding locality.
We donated the original kitchen to an retro enthusiast and thoroughly modernised the property. Refurbished and extended semi-detached property in quiet street off Malone Road. The property was in a very poor state of repair when purchased. We extended the kitchen and altered the internal walls to incorporate a utility room and downstairs toilet.
A new bathroom was installed and house was re-plastered from top to bottom. New doors and architrave was fitted throughout. A contemporary kitchen with marble worktops and splash backs was installed. This excellent attractive semi detached property occupies a superb extensive level site within a much sought after residential area and is extremely convenient to the many amenities in the surrounding locality.
Reviews (2)
Marie Mcphelim
Jul 09, 2017
Report
William Mcallister
Jun 26, 2016
Report
My partner has been waiting for months to have a mobility ramp fitted by your company on behalf of N G holms in possilpark up to date she has been given at least 5 differant dates scince the 21st of october and it is now the 5th of december and she is still waiting i find it a bit mutch that a disabled persson has waited so long members of your team came and removed slabs in the garden 5 weeks ago and nothing has been done scince poor poor service to say the least