Tyson Utilities are committed to delivering high quality workmanship with excellent customer service. Our clients are the most important part of our business and their wishes always come first. Full post-work reinstatement including Concrete, Tarmac and Brickwork (where required) on footpaths and roads, Kerb and road building to Highway Standard.
Services
We will soon be able to offer companies / employees a broad range of training courses to support the local community and help Companies for fill their Health & Safety requirements on all levels. We will be offering a wide range of training courses to include, Confined Space Entry, Safety Awareness, Plant Operation and First Aid.
Due to the nature of some of the equipment used on site we ensure that all of our team apply the correct safety procedures to each task and have full working knowledge of the machinery/tools they will be using - this is supported by a pro-active training programme and monthly Health and Safety audits.
The top cutter is widely used to install utility infrastructure in tarmac roads and footways because of it's ability to cut a clean, accurate trench. With side shift feature it allows live sliding and working on the outside line of the tyre to both the left and right of the machine. The top cutter also has dust skirting around cutting wheel and water suppression jets directly onto cutting wheels.
Dig alongside roads, curbs, buildings and walls with the fully hydrostatic sliding offset T558 COMMANDER 3 trencher. It's the only offset trencher in its class that can trench outside the width of its left track. A 185 hp/138 kW John Deere Tier 3 engine provides power for rock-solid results in cross-country drainage and utility pipe installations, as well as foundation and roadway projects.
Reviews (1)
Leighton Holmes
Aug 17, 2021
Report